Oslo, 8 September 2026: BlueNord ASA ("BlueNord" or the "Company") has today announced its preliminary production figures for August 2026. In August 2026, preliminary production was 44.3 mboepd net to BlueNord. The Tyra hub produced 27.4 mboepd and the base assets, the Dan, Gorm and Halfdan hubs, contributed 16.9 mboepd.
At the Tyra hub, operations remained stable during August, and a new record daily production rate of 29.9 mboepd net was achieved on 17 August. The month of August ended strongly, with output above 29 mboepd for the last 11 days of the month. Two temporary production upsets occurred during the month, with fast recovery following both events. As a result, average production for August was 27.4 mboepd net to BlueNord.
The base assets delivered 16.9 mboepd net to BlueNord in August. Production was in line with expectations, though lower than in previous months due to the planned Halfdan A maintenance shutdown and replacement of the leaking production manifold on Dan. Following completion of the Halfdan A maintenance and manifold replacement on Dan, production returned to expected levels towards the end of the month. Production from the Gorm hub remained stable throughout the month.
This information is subject to disclosure requirements pursuant to section 5-12 of the Norwegian Securities Trading Act.
***
Cathrine Torgersen, Chief Corporate Affairs Officer Phone: +47 915 28 501
About BlueNord ASA BlueNord is a strategically important European oil and gas company that specialises in producing and developing energy resources, and in activities which support the energy transition. The Company has a 36.8 percent interest in the Danish Underground Consortium (DUC) that is responsible for oil and gas production in the Danish North Sea. BlueNord is listed on the Oslo Stock Exchange and trades under the ticker "BNOR". For further information, please visit: www.bluenord.com.