HONG KONG, Sept. 14, 2026 (GLOBE NEWSWIRE) -- 3 E Network Technology Group Limited (Nasdaq: MASK) (the “Company” or “3 E Network”), a business-to-business (“B2B”) information technology (“IT”) business solutions provider, committed to becoming a next-generation artificial intelligence (“AI”) infrastructure solutions provider, today announced the integration of Computational Fluid Dynamics (“CFD”) simulation and Digital Twin technologies into its key AI computing center in Mikkeli, Finland. Following the earlier announcement of the facility’s physical blueprint designed to be compatible with the NVIDIA Vera Rubin architecture, the Company is now applying “software-defined engineering” to integrate these technologies into the management of the data center across its design, physical deployment and daily operations, to support the infrastructure’s ability to accommodate future ultra-high-density thermal loads.
Design and Deployment Phase: Multi-Physics Simulation
Unlike the relatively stable workloads of traditional cloud data centers, AI computing centers generate significant “Transient Power Spikes” during large-scale model training as cluster nodes operate in synchronization. During the design and deployment phases, traditional macro room-level airflow assessments are increasingly challenged. To address this, 3 E Network has combined high-precision CFD computational power with 3D spatial modeling to conduct “Chip-to-Facility” multi-physics analysis across the following engineering areas:
Operations Phase: Closed-Loop Management of Facilities and Data
Upon the delivery of the data center, compute clusters require significant capital investment and operational management. The digital management foundation built by 3 E Network is an interactive system that continuously synchronizes data with the physical facility to support daily operations:
Engineering Vision: Enhancing Lifecycle Reliability through Software-Defined Engineering
As the AI compute industry transitions to high-density chip architectures, engineering standards for data center thermal management and power distribution are becoming increasingly rigorous. The integration of CFD simulation and Digital Twin technology reflects a broader shift in intelligent computing center construction towards a “data-driven” and “highly predictable” direction.
Dr. Tingjun Yang, Chief Executive Officer of 3 E Network, stated: “In the Mikkeli project, we are not only building robust physical infrastructure but also establishing a predictive digital management system designed to support the facility throughout its lifespan. By integrating multi-physics computation and spatial virtualization technologies across design, deployment, and operations, we use software-defined engineering to continuously evaluate and mitigate physical risks. This reflects 3 E Network’s prudent approach to capital-intensive investments and is intended to support the long-term reliability of high-value AI compute clusters hosted at the facility. We will continue to apply high engineering standards in developing intelligent computing center solutions designed to balance operational stability with energy efficiency.”
About 3 E Network Technology Group Limited
3 E Network Technology Group Limited is a business-to-business (“B2B”) information technology (“IT”) business solutions provider committed to becoming a next-generation artificial intelligence (“AI”) infrastructure solutions provider. It upholds the industry consensus of “AI and energy symbiosis” and has a strong vision in the field of energy investment. The Company’s business comprises two main portfolios: the data center operation services portfolio and the software development portfolio. For more information, please visit the Company’s website at https://3emask.com/.
Forward-Looking Statements
Certain statements in this announcement are forward-looking statements. These forward-looking statements involve known and unknown risks and uncertainties and are based on the Company’s current expectations and projections about future events that the Company believes may affect its financial condition, results of operations, business strategy, and financial needs. Investors can identify these forward-looking statements by words or phrases such as “approximates,” “assesses,” “believes,” “hopes,” “expects,” “anticipates,” “estimates,” “projects,” “intends,” “plans,” “will,” “would,” “should,” “could,” “may” or similar expressions. The Company undertakes no obligation to update or revise publicly any forward-looking statements to reflect subsequent events or circumstances, or changes in its expectations, except as may be required by law. Although the Company believes that the expectations expressed in these forward-looking statements are reasonable, it cannot assure you that such expectations will turn out to be correct, and the Company cautions investors that actual results may differ materially from the anticipated results and encourages investors to review other factors that may affect the Company’s future results in the Company’s registration statement and other filings with the U.S. Securities and Exchange Commission.
For more information, please contact:
3 E Network Technology Group Limited
Investor Relations Department
Email: ird@3emask.com
Website: https://3emask.com/